Analysis Of BJP's Promise from 2019
LET'S GO ON TO THE NEXT SECTOR
3. INFRASTRUCTURE
Promise 1 - Constructing 60,000 Kms of Highways
In last 9 times , 50,000 Kms of highways have been constructed. The pace of construction has more than doubled to 28 Km per day.
Conclusion - FULFILLED ✅
Promise 2 - Electric Railway Tracks
As of March 2023, about 90% of our broad gauge network of Indian Railways has been electrified. Also about 50% is done in last 5 years itself.
Conclusion - FULFILLED ✅
Today the eastern corridor is fully operational and about 70% of western corridor is ready.
This milestone is already being achieved by the government. The major port cargo handling capacity has been doubled from 8710 to 16,100 Lakh tonnes per annum.
Conclusion - FULFILLED ✅
As of December 2022 , India have achieved 69% of its target for 175 GW of Renewable Energy.
Conclusion - On Track ✅
Promise 6 - Piped water for every Household
As of December 2023 , 72% of Households are now equipped with piped water.
Conclusion - On Track ✅
Promise 7 - Operational Airports to 150
Currently there are 131 operational airports in India which includes 29 international, 92 domestic and 10 custom airports.
Conclusion - On Track ✅
Promise 8 - Gram Panchayat with high speed optical fiber
Initial target was for about 6 Lakh villages in contrast work has been completed for 2 Lakh villages where 669,012 FTH connections are provided.
Conclusion - PARTIALLY FULFILLED
Promise 9 - Completion of Phase-1 of Bharatmala Project
As of November 2023, only 42% of project has been completed which was to be done in 2022. The deadline has been extended to FY28.
Conclusion - NOT FULFILLED ❌
Overall in Infrastructure BJP has done a phenomenal job of building infrastructure in the country, be it road or railway.
Also many work are on the verge of completion which would be completed by 2024.